+44 207 394 30 90 (London)

LUKOIL exercises a comprehensive approach to the development of the Northern Caspian and intends to build a gas chemical complex in the Stavropol territory

Main » News Feed » LUKOIL exercises a comprehensive approach to the…

In the course of the meeting with Russian President Vladimir Putin, Vagit Alekperov, Head of Lukoil, has reported on the results of company’s activities in 2017 and perspective projects for 2018.

Lukoil demonstrated a dynamic growth in 2017. Total investment counted 500bn RUB.

As Lukoil annually launches new offshore platforms in the Caspian Sea, in 2017 a new platform was built within the framework of phase 2 of Filanovsky field development. New platforms are expected to be launched in 2018 and 2019 as well. There is a new project prepared for the integrated development of the Northern Caspian.

The investment decision has been made on the construction of a gas chemical facility near Budennovsk in the Stavropol territory. Key products of the future facility will be chemicals and polyethylene and polypropylene (phase 2). The facility will ensure the growth of the Stavropol territory’s south. The region lacks employment opportunities, while a new facility will create 600 job opportunities, with over 3 thousand people to be involved in the construction. Project cost is estimated at about 120bn RUB.

The company also carried out modernisation of its refineries in 2017. The upgraded facilities allow providing the country with high-quality fuels. In 2017 Lukoil also launched production of EKTO 100 gasoline. This fuel is cost effective, eco-friendly and allows stable engine work.

Vladimir Putin said that Lukoil is one of the major global vertically-integrated companies, whose portfolio includes 2% of global oil output and 18% of Russian oil output.

MORE

EuroChem and Maire Tecnimont sign memorandum of intent for potential new urea and ammonia plant

EuroChem Group has signed an early works contract for a potential new urea and ammonia production facility, subject to further investment plan approval, at Kingisepp, northwest Russia, with Maire Tecnimont. Under the terms of the agreement, Maire Tecnimont will carry out preliminary engineering and site surveying work at the brownfield site adjacent to EuroChem’s existing…


Fertz major EuroChem nears decision on new ammonia, urea, and methanol plants

KINGISEPP (ICIS)–EuroChem is nearing a final decision on ambitious plans for new ammonia, urea, and methanol plants in northwest Russia to serve international markets, two executives from the Switzerland-headquartered fertilizer group disclosed on Tuesday. The green light for a 1m tonne/year ammonia facility; 1.1m-1.5m tonne/year granular urea plant; and a 1.8m tonne/year methanol manufacturing unit…


SOCAR, Tekfen sign memorandum on construction

A meeting was held on May 31 between Rovnag Abdullayev, President of Azerbaijan’s SOCAR, and Murat Gigin, Chairman of Turkey’s Tekfen, Trend reports referring to SOCAR. At the meeting, the parties signed a memorandum on the construction of a new carbamide plant in Azerbaijan. Based on the experience gained in the construction of the existing…